Espoonlahti station and line tunnels

Urban Metro
Espoo, Finland

The Espoonlahti tunnels and stations - LU24 - form a part of the second stage of the construction of the Länsimetra (Western Metro), which will connect the capital of Helsinki with the city of Espoo over a total length of 7 kilometers, with 5 underground stations.

Basic information

Project Investor:

Länsimetro

Project Designer:

Kalliosuunnittelu Oy Rockplan Ltd.

Project Duration:

05/2016 – 11/2018

Espoonlahti station and line tunnels
Obrázek

Characteristics

The LU24 - Espoonlahti section, which was tunneled using the Drill & Blast method in hard granite rocks, includes a single-space metro station and two single-track tunnels with a total length of 2,984 m. The construction also included tunneling of seven inter-tunnel connections and two technological chambers with ventilation shafts.

The Project in Numbers

  • 2 984 m
    Total length
  • 36,2 m2
    Cross-section through the line tunnel
  • 7 - 30 m
    Rock cover height
  • 383 m3
    Cross-section through the station
  • 12 373 m3
    Quantity of the sprayed concrete
  • 3 700 h
    Grouting time (injection pump motor hours)

Exceptional Nature of Project

The most challenging part of the project was the excavation of the station under the Lippulaiva shopping center and blasting works in densely populated areas, along with a high volume of grouting work.