- Home
- Segments
- Other Civil Engineering Works
- Completion of the Vltava waterway in České Budějovice - Hluboká nad Vltavou section
Completion of the Vltava waterway in České Budějovice - Hluboká nad Vltavou section
The object of the chamber lock including the upper and lower dock on the right bank of the Vltava River near the České Vrbné weir, river km 233.10.
Basic information
Project Investor:
Ředitelství vodních cest České republiky
Project Designer:
Sweco Hydroprojekt a a.s.
Project Duration:
09/2009 – 03/2011
Project in numbers
- width 6,0 m x length 45,0 mApplied dimensions of the chamber
- min. 3,0 mDepth of water above the stoppers
- pro plavidla do 300 t s rozměry 38,5 m délky a 5,05 m šířkyUžití
Characteristics
A chamber lock object including the upper and lower dock on the right bank of the Vltava River near the České Vrbné weir, river km 233.10. It is a part of the České Budějovice – Hluboká nad Vltavou waterway. The structure consists of a chamber lock, upper and lower dock, a control room, vehicular surfaces, fencing of the premises, the technology of the chamber lock, the control system and heavy and light current electrical wiring.
Exceptionality of the structure
Together with the electrical wiring, a control system was built, the centre of which is a PLC computer located in the control room, which manages and coordinates individual subsystems according to the current flow. Together, it controls the chamber lock, the weir flaps and the sport channel closure gate.