Loukov

Four giant reservoirs were built, each with a diameter of 50 meters, a height of 22 meters and a capacity of 35 thousand cubic meters.

Basic information

Project Investor:

ČEPRO, a.s.

Project Designer:

ARTECH spol. s r.o.

Project Duration:

02/2007 – 10/2011

Underground Fuel Storage Site

Project in Numbers

  • 47,80 m
    Inner Diameter of Reservoirs
  • 22 m
    Height of Reservoirs
  • 4x 35 000 m3
    Capacity
Obrázek

Characteristics

Four giant reservoirs were built, each with a diameter of 50 meters, a height of 22 meters and a capacity of 35 thousand cubic meters, yielding a total volume of 140,000 m3. The large-capacity reservoirs are recessed and covered with soil. The thickness of their bottom is 1.2 m at the widest edge, whilethe walls have a thickness of 0.6 m. These are pre-stressed reinforced concrete structures. The roof of each reservoir, with a weight of 1,450 tonnes, is made up of a dome shaped, spherical canopy with a height of 4.79 m. It was concreted at the reservoir bottom and subsequently lifted by 20 m using a hydraulic system. The average lifting speed was 50 cm per hour, whilethe entire liftlasted 4 to 5 days, including monitoring and measurements.

Uniqueness of Construction

For the first time in the Czech Republic, a double-skin fiberglass lining was used instead of a conventional steel lining.