Extension of tram line from Osová to the MU campus in Bohunice, Brno

Roads and Bridges
Brno

The main purpose of the new tram line was to improve and speed up the transport connection of the Bohunice Hospital and the Masaryk University campus with the centre of Brno and its main railway station. 

Basic information

Project Investor:

Statutory City of Brno, DPmB a.s.

Project Designer:

METROPROJEKT Praha, a.s., HURYTA s.r.o.

Project Duration:

10/2019 – 12/2022

Extension of tram line from Osová to the MU campus in Bohunice, Brno
Obrázek
Obrázek
Obrázek
Obrázek

Characteristics

During the construction of the new double-track tram line from the Osová tram stop to the transport hub Bohunice Hospital, Metrostav excavated a tunnel more than 600 m long and built seven other tunnel objects. The excavation was carried out under the protection of the underground walls and tunnel ceiling with full traffic on the adjacent busy road. 

Project in figures

  • 912 m
    Length of the track
  • 602 m
    Length of tunnel excavated
  • 180
    Building objects

Uniqueness of construction

The contract for the construction of the tramway line in Brno-Bohunice included not only its construction, but also obtaining a building permit at the beginning and, after completion of the construction works, ensuring subsequent approval and test operation. During the tunnel excavation, the builders were surprised by the instability of the slopes of the construction pit, which brought many technical and financial problems. Instability of the slopes was also encountered during the construction of the underground walls and the concreting of the tunnel ceiling. Moreover, these works were complicated by utility relocations and could not be carried out continuously.