The lightweight cladding operation
The lightweight cladding operation (LCO) based in Nymburk has an area of 13,000m2 of which 6,000m2 is production space.
The activity of the operation is a comprehensive supply of LCO with a focus on the production of windows, doors, post-and-beam façades, modular façades, skylights and other structures made of aluminium systems, which is ensured by the capacities in the field of LCO design from the design of the solution to the production documentation, calculation activities, production preparation, production and custom implementation.
We work mainly with SCHÜCO, HUECK, Reynaers, Aluprof systems, including fire structures.
Division 3 has its own production preparation, warehouse and production facilities, along with dispatch and transport. The total capacity of the plant is up to 60 thousandm2 depending on the type of order.
The LCO team has many years of experience in the field, which is evidenced by a number of successful projects, such as the reconstruction of the building of the Electric Enterprises, Bubenská, reconstruction of the Army Museum Žižkov, Student House, and ČSOB in Hradec Králové.
Reference
Reconstruction of the Bubenská 1 building
Delivery: aluminium glazed skylights
System: REYNAERS
Implementation date: 8/ 2019- 10/2019
Palmovka 3
Delivery: aluminium façade and frame structures
System: Wicona
Implementation date: 8/ 2017- 3/2018
OAC Poděbradská Prague 9 (Ptáček)
Delivery: aluminium façade and frame structures
System: Wicona
Implementation date: 6/ 2019- 3/2020
At Home - "Student House Holešovice"
Delivery: aluminium façade and frame structures
System: REYNAERS
Implementation date: 11/ 2019- 3/2020
Prague, Vítkov - Resistance Memorial at VHÚ
Delivery: aluminium glazed skylights
System: REYNAERS
Implementation date: 4/ 2019- 5/2019
ČSOB - HHQ Hradec Králové
Delivery: aluminium glazed skylights, aluminium façade and frame structures
System: skylights circular - SCHUCO; the rest REYNAERS
Implementation date: 11/ 2019- 10/2020
Primary School Šlapanice - pavilions F and G
Delivery: aluminium façade structures
System: skylights ALUPROF
Implementation date: 11/ 2019- 3/2020